Sapphire Suite Delivery roadmap Plan window active

Base44 launch-scope parity + redesign

One evidence-led path to October 3.

Stabilize the reviewed baseline, freeze the launch scope, then deliver parity and redesign in parallel—with proof integrated every step of the way.

The target is 100% of the owner-approved launch scope—not a misleading claim that deferred, rejected, or blocked work has been delivered.

1,645capabilities in the control set
702implemented or equivalent
335remaining or partial
Oct 3release-candidate target

Owner decisions locked

Clear exclusions protect the date.

Deferred work stays visible, but never counts as delivered parity.

Deferred from October 3

Referrals workflow

Intake, funnel, SLA, source management, analytics, reporting, export, and supporting data are outside the launch scope.

23 Census and Clarion capability IDs move to approved-deferred after current-record reconciliation.

Deferred through December 2026

Dedicated mobile product

Native distribution, device integrations, push, offline sync, and mobile-only navigation move to the 2027 planning window.

Responsive web and mobile-viewport accessibility remain required for October 3.

37-day plan window

The critical path

Scope locks early. Proof gets a full week.

  1. 01

    Aug 27–29

    Stabilize the baseline

    Land the three final hygiene corrections, targeted re-review, full CI, and the exact accepted merge.

    Active now
  2. 03

    Sep 3–4

    Prepare the factory

    Publish dependencies, route contracts, migration allocation, implementation packets, and branch ownership.

    Queued
  3. 04

    Sep 4–9

    Wave 1 · critical truth

    Close security-, authority-, data-truth-, and workflow-critical parity gaps.

    Queued
  4. 05

    Sep 10–15

    Wave 2 · core workflows

    Finish priority product workflows and integrate the first redesigned launch routes.

    Queued
  5. 06

    Sep 16–20

    Wave 3 · launch scope

    Complete the remaining launch-critical capabilities and redesign coverage.

    Queued
  6. 07

    Sep 21–25

    Reconcile and freeze

    Close final gaps, approve visual differences, freeze scope, and stop net-new feature work.

    Queued
  7. 08

    Sep 26–Oct 2

    Prove the candidate

    Run source, database, browser, accessibility, security, upgrade, and visual closure.

    Queued
  8. 09

    Oct 3

    Release candidate

    Publish an evidence-backed recommendation. Deployment remains a separate owner authorization.

    Target

Parallel delivery

Four lanes. One control plane.

Three lanes build while one continuously reviews and integrates.

01

Governed foundation

Backend parity

Database functions, authorization, RLS, imports, integrations, effective-time behavior, and migrations.

No authority widens silently.
02

Complete workflows

Product parity

Missing routes, actions, state transitions, recovery, empty states, and responsive behavior.

Every capability keeps evidence.
03

One Sapphire system

Redesign

Shared shell, navigation, design system, and launch-critical route composition.

Visual change never deletes behavior.
04

Continuous proof

Review + integration

Independent review, matrix reconciliation, collision control, and authoritative gates.

Nothing waits for a final big-bang review.

Release standard

What “done” means.

October 3 produces an evidence-backed release candidate. Production deployment, remote migrations, and gated provider behavior remain separate approvals.

The fastest next move

Decide once. Build in parallel.

The owner-approved Base44 taxonomy, source basis, and October 3 launch scope must freeze by September 3. Anything still undecided after that date is explicitly deferred—not silently omitted and never counted as parity.